Employer: National Electric Power Company – Amman South Substation TR4
Scope of Work: Supply and Installation of 400KV Substation Transformer Water Spray Deluge System
Project Overview:
This project involves the design, supply, and installation of a comprehensive water spray deluge system for the 400KV substation transformer, which includes:
- Installation of an underground main pipe to support the deluge system.
- Supply and installation of a Deluge Valve assembly for precise control.
- Installation of water spray nozzles and pipes for effective coverage.
- Provision of explosion-proof heat detectors for enhanced safety.
- Supply and installation of a Releasing Fire Alarm Panel for system activation.
- Installation of fire hydrants to facilitate emergency response.
These upgrades are essential for bolstering fire protection and safety measures at the Amman South Substation.