Employer: ACWA Power – Zarqa - Hussein New Power Station
Scope of Work: Fire Protection System Assessment, Supply, and Installation
Project Overview:
This project involves a thorough assessment of the fire protection system and the subsequent supply and installation of necessary upgrades, including:
- Evaluation of the current fire protection infrastructure.
- Supply and installation of advanced fire detection and suppression systems.
- Implementation of enhanced fire protection measures to ensure optimal safety at the Zarqa - Hussein New Power Station.
These improvements are aimed at bolstering safety and meeting the fire protection standards for the power station.